Slowing the flow at Pickering

Pickering, North Yorkshire · Event or project period: 2015

Pickering’s catchment project uses measures intended to store water and delay its passage towards the town. Forest Research provides monitoring and an assessment of the Boxing Day 2015 event.

A successful outcome in one event does not prove complete protection. The contribution of each measure needs modelling or monitored comparison.

Saved on this browser. An example’s listed role does not certify that it covers every specification dimension.

Evidence and its scope

ClaimPeriod and scopeSource
The partnership evaluated the performance of its measures during the December 2015 flood event.

historical evidence

December 2015

Pickering catchment

Open source

Checked 2026-10-07

Possible requirement roles

Build a catchment explanation

Connect the catchment measures to stores and transfers: slowing a route or holding water can spread arrival at the town over time. The effect depends on available storage and how tributaries peak together.

The historical event evidence is a starting point for evaluating the combined scheme. It is not evidence of protection against every future storm.

Compare geographical explanations

Compare this catchment approach with a hard defence at the town. Which changes the timing of water, and which changes local exposure?

Evidence needed for a fuller case study

Check the teaching coverage

Practise using the evidence

Responses are not automatically scored. Use the guidance to check the evidence and reasoning.

Apply a related skill

Scatter plots · Source evaluation