Jubilee flood relief channel

Maidenhead, Windsor and Eton, England · Event or project period: 2002

The Environment Agency opened the Jubilee flood relief channel in 2002 as part of the Maidenhead, Windsor and Eton scheme. It diverts some flood flow through an additional channel.

Evaluate a flood channel at catchment scale. A local improvement does not establish that downstream risk has vanished.

Saved on this browser. An example’s listed role does not certify that it covers every specification dimension.

Evidence and its scope

ClaimPeriod and scopeSource
The man-made channel is 11.6 kilometres long.

stable evidence

Scheme opened 2002; description updated 30 October 2025

Jubilee flood relief channel

Open source

Checked 2026-10-07