Hornsea One offshore wind
The government’s 2016 announcement described the planned Hornsea One project and its electrical capacity. Offshore siting links wind resources with marine space, cable connections and maintenance access.
A historical “largest” label belongs to its date. Capacity is a maximum output rating, not the energy generated every hour.
Saved on this browser. An example’s listed role does not certify that it covers every specification dimension.
Evidence and its scope
| Claim | Period and scope | Source |
|---|---|---|
| The 2016 announcement described planned capacity of approximately 1.2 gigawatts. | February 2016 announcement | Open source |
Possible requirement roles
- Energy supply and transitionsDistinguish capacity from generation.; Identify the technology, location and time period.; Assess reliability, access and environmental consequences.