Boscastle flood and channel improvements

Boscastle, Cornwall · Event or project period: 2004

Torrential rain on 16 August 2004 produced a rapid flood that damaged homes, businesses and transport. The Environment Agency’s retrospective describes changes to the Valency and Jordan.

Widening and deepening the Valency and replacing a bridge increased flow capacity. Space for sediment and measures against blockage address processes that a taller wall alone would miss.

Saved on this browser. An example’s listed role does not certify that it covers every specification dimension.

Evidence and its scope

ClaimPeriod and scopeSource
The Valency scheme widened and deepened the river and replaced the lower bridge to increase capacity.

historical evidence

Post-2004 recovery; reported in 2014

River Valency through Boscastle

Open source

Checked 2026-10-07

Possible requirement roles

Practise using the evidence

Responses are not automatically scored. Use the guidance to check the evidence and reasoning.

Apply a related skill

Gradient · Source evaluation