A storm, its hydrograph and flood management

Connect an exact storm record with exposure, land cover and several management choices.

A storm, its hydrograph and flood management

Original fictional unfamiliar-resource pack. Work across the resources; each describes the same teaching scenario. This is not an official examination paper or a real project forecast.

One fictional storm record

Scroll the diagram sideways to see the full resource.

Fictional storm hydrographHour 0: 0 mm rainfall, 5 m³/s discharge; Hour 1: 4 mm rainfall, 5 m³/s discharge; Hour 2: 11 mm rainfall, 5 m³/s discharge; Hour 3: 6 mm rainfall, 5 m³/s discharge; Hour 4: 0 mm rainfall, 7 m³/s discharge; Hour 5: 0 mm rainfall, 13 m³/s discharge; Hour 6: 0 mm rainfall, 19 m³/s discharge; Hour 7: 0 mm rainfall, 13 m³/s discharge; Hour 8: 0 mm rainfall, 7 m³/s discharge; Hour 9: 0 mm rainfall, 5 m³/s discharge; Hour 10: 0 mm rainfall, 5 m³/s discharge; Hour 11: 0 mm rainfall, 5 m³/s discharge; Hour 12: 0 mm rainfall, 5 m³/s discharge010203040051015200123456789101112Discharge (m³/s)Rainfall (mm)Hour since record began
HourRainfall in preceding hour (mm)Discharge (m³/s)
005
145
2115
365
407
5013
6019
7013
807
905
1005
1105
1205
Fictional storm hydrograph. Original fictional resource; not an official map or real dataset.
Resource description

Hour 0: 0 mm rainfall, 5 m³/s discharge; Hour 1: 4 mm rainfall, 5 m³/s discharge; Hour 2: 11 mm rainfall, 5 m³/s discharge; Hour 3: 6 mm rainfall, 5 m³/s discharge; Hour 4: 0 mm rainfall, 7 m³/s discharge; Hour 5: 0 mm rainfall, 13 m³/s discharge; Hour 6: 0 mm rainfall, 19 m³/s discharge; Hour 7: 0 mm rainfall, 13 m³/s discharge; Hour 8: 0 mm rainfall, 7 m³/s discharge; Hour 9: 0 mm rainfall, 5 m³/s discharge; Hour 10: 0 mm rainfall, 5 m³/s discharge; Hour 11: 0 mm rainfall, 5 m³/s discharge; Hour 12: 0 mm rainfall, 5 m³/s discharge

Land cover and homes

ReachImpermeable surface (%)HomesHomes in mapped flood extent (%)
Upper reach2080020
Town reach65180050
Lower reach35120030
Original fictional teaching data. These are not observations or predictions for a real place.
Resource description

The extent is one scenario footprint. It is not an annual probability map or a map of all future floods.

Management alternatives

OptionCapital cost (£ million)BenefitLimitation
Upstream storage and wetland restoration4.2May attenuate peak flow and provide habitatLand agreements and maintenance are required; storage may fill in extreme events
Town flood wall7.5Protects selected assets up to its design conditionsOvertopping and downstream consequences remain possible
Property adaptation and warnings3.1Reduces some damage and improves preparationDoes not stop floods or secure all transport links
Original fictional teaching data. These are not observations or predictions for a real place.
Resource description

Available capital budget: £8 million. Options are alternatives; their benefits cannot simply be added. Operating costs are separate.

Options

Upstream storage and wetland restoration

Capital cost: £4.2 million

May attenuate peak flow and provide habitat

Land agreements and maintenance are required; storage may fill in extreme events

Town flood wall

Capital cost: £7.5 million

Protects selected assets up to its design conditions

Overtopping and downstream consequences remain possible

Property adaptation and warnings

Capital cost: £3.1 million

Reduces some damage and improves preparation

Does not stop floods or secure all transport links

Stakeholder statements

Town resident: Our road and homes need protection.

Downstream resident: Reducing risk in the town must not increase our risk.

Upstream farmer: Storage on my land needs an agreed payment and responsibilities.

1. What is peak discharge in m³/s?

2. What is the peak lag time in hours?

3. What can this record establish?

Choose an answer

4. Calculate homes in the mapped extent at the town reach.

5. Explain one way impermeable surfaces may affect the storm response, and one reason this record cannot isolate their effect.

6. Recommend an option for a storm, its hydrograph and flood management. Use at least two resources, compare an alternative and address an uncertainty or stakeholder concern.

Limits of this resource model
  • Peak and lag describe one synthetic storm.
  • Surface cover alone does not establish discharge or annual flood risk.

Make an editable teacher pack