Energy demand, output and competing priorities
Distinguish annual output from capacity and assess costs, reliability and emissions.
Energy demand, output and competing priorities
Use maps, data and stakeholder evidence to develop a geographical argument. The resources describe one fictional teaching scenario.
Capacity, output and land
| Project | Capacity (MW) | Capacity factor (%) | Annual output (GWh) | Capital cost (£ million) | New land footprint (ha) |
|---|---|---|---|---|---|
| Wind | 20 | 38 | 66.58 | 18 | 24 |
| Solar roofs | 15 | 14 | 18.4 | 12 | 0 |
| Small hydro | 10 | 41 | 35.92 | 19 | 8 |
Resource description
Annual output = capacity × capacity factor/100 × 8,760 hours ÷ 1,000. Capacity is a power rate; output is an energy quantity.
Demand and emissions
| Measure | Value | Unit |
|---|---|---|
| Annual local demand | 90 | GWh |
| Wind: lifecycle emissions intensity | 12 | g CO₂e/kWh |
| Solar roofs: lifecycle emissions intensity | 35 | g CO₂e/kWh |
| Small hydro: lifecycle emissions intensity | 24 | g CO₂e/kWh |
Resource description
Fictional lifecycle intensity estimates use the same boundary. They are not operational emissions only; output timing, storage and grid losses are omitted.
Management alternatives
| Option | Capital cost (£ million) | Benefit | Limitation |
|---|---|---|---|
| Wind | 18 | Estimated annual output 66.58 GWh; Lifecycle intensity 12 g CO₂e/kWh | Variable generation and landscape effects; Operating costs and grid connection need separate assessment |
| Solar roofs | 12 | Estimated annual output 18.4 GWh; Lifecycle intensity 35 g CO₂e/kWh | Seasonal generation and roof agreements; Operating costs and grid connection need separate assessment |
| Small hydro | 19 | Estimated annual output 35.92 GWh; Lifecycle intensity 24 g CO₂e/kWh | River ecology and low-flow constraints; Operating costs and grid connection need separate assessment |
Resource description
Available capital budget: £20 million. Options are alternatives; their benefits cannot simply be added. Operating costs are separate.
Options
Wind
Capital cost: £18 million
Estimated annual output 66.58 GWh
Lifecycle intensity 12 g CO₂e/kWh
Variable generation and landscape effects
Operating costs and grid connection need separate assessment
Solar roofs
Capital cost: £12 million
Estimated annual output 18.4 GWh
Lifecycle intensity 35 g CO₂e/kWh
Seasonal generation and roof agreements
Operating costs and grid connection need separate assessment
Small hydro
Capital cost: £19 million
Estimated annual output 35.92 GWh
Lifecycle intensity 24 g CO₂e/kWh
River ecology and low-flow constraints
Operating costs and grid connection need separate assessment
Stakeholder statements
Grid operator: We need output when demand occurs, not only a yearly total.
Resident: Local environmental effects and affordability need consideration.
Climate adviser: Compare lifecycle boundaries consistently.
Resource assumptions
- Capacity factors are fictional assumptions.
- Annual balances do not represent hourly security or whole-system cost.