Wind: £18 million
Estimated annual output 70.08 GWh
Lifecycle intensity 12 g CO₂e/kWh
Variable generation and landscape effects
Operating costs and grid connection need separate assessment
Solar roofs: £12 million
Estimated annual output 18.4 GWh
Lifecycle intensity 35 g CO₂e/kWh
Seasonal generation and roof agreements
Operating costs and grid connection need separate assessment
Small hydro: £19 million
Estimated annual output 37.67 GWh
Lifecycle intensity 24 g CO₂e/kWh
River ecology and low-flow constraints
Operating costs and grid connection need separate assessment
Grid operator: We need output when demand occurs, not only a yearly total.
Resident: Local environmental effects and affordability need consideration.
Climate adviser: Compare lifecycle boundaries consistently.
| Project | Capacity (MW) | Capacity factor (%) | Annual output (GWh) | Capital cost (£ million) | New land footprint (ha) |
|---|---|---|---|---|---|
| Wind | 20 | 40 | 70.08 | 18 | 24 |
| Solar roofs | 15 | 14 | 18.4 | 12 | 0 |
| Small hydro | 10 | 43 | 37.67 | 19 | 8 |
Annual output = capacity × capacity factor/100 × 8,760 hours ÷ 1,000. Capacity is a power rate; output is an energy quantity.
| Measure | Value | Unit |
|---|---|---|
| Annual local demand | 100 | GWh |
| Wind: lifecycle emissions intensity | 12 | g CO₂e/kWh |
| Solar roofs: lifecycle emissions intensity | 35 | g CO₂e/kWh |
| Small hydro: lifecycle emissions intensity | 24 | g CO₂e/kWh |
Fictional lifecycle intensity estimates use the same boundary. They are not operational emissions only; output timing, storage and grid losses are omitted.
| Option | Capital cost (£ million) | Benefit | Limitation |
|---|---|---|---|
| Wind | 18 | Estimated annual output 70.08 GWh; Lifecycle intensity 12 g CO₂e/kWh | Variable generation and landscape effects; Operating costs and grid connection need separate assessment |
| Solar roofs | 12 | Estimated annual output 18.4 GWh; Lifecycle intensity 35 g CO₂e/kWh | Seasonal generation and roof agreements; Operating costs and grid connection need separate assessment |
| Small hydro | 19 | Estimated annual output 37.67 GWh; Lifecycle intensity 24 g CO₂e/kWh | River ecology and low-flow constraints; Operating costs and grid connection need separate assessment |
Available capital budget: £20 million. Options are alternatives; their benefits cannot simply be added. Operating costs are separate.
| Option | Capital cost (£ million) | Capital with 20% overrun (£ million) | Operating assumption (£ million/year) | Capital plus 10 years operating (£ million) |
|---|---|---|---|---|
| Wind | 18 | 21.6 | 0.99 | 27.9 |
| Solar roofs | 12 | 14.4 | 0.48 | 16.8 |
| Small hydro | 19 | 22.8 | 0.48 | 23.8 |
The budget limits capital spending. Operating costs require a separate funding stream. Ten-year totals are undiscounted, hold annual costs constant and omit benefits, inflation and residual value. A 20% overrun is a stress scenario, not its probability.
Capacity factors are fictional assumptions.; Annual balances do not represent hourly security or whole-system cost.
The shading represents a percentage of households, not a total. Each class includes its lower boundary and excludes its upper boundary: a value of 20 belongs in 20–30, not 10–20.
Scroll the diagram sideways to see the full resource.
| District | Reported damage (%) | Households |
|---|---|---|
| A | 2 | 1000 |
| B | 14 | 500 |
| C | 24 | 500 |
| D | 35 | 100 |
A–D use these non-overlapping classes: 0 to less than 10%; 10 to less than 20%; 20 to less than 30%; 30 to less than 40%. A has 1,000 households and D has 100 households.
Original fictional model and resources: GeographyHelp. · Written practice context: https://filestore.aqa.org.uk/resources/geography/AQA-70372-SMS.PDF